<u id="zarq5"></u>

    1. <i id="zarq5"><thead id="zarq5"><li id="zarq5"></li></thead></i>
    2. <u id="zarq5"><sub id="zarq5"></sub></u>

      <u id="zarq5"></u>

    3. Stock code:002266
      0571-89939661
      CN EN
      Zhefu History
      2022 - 2018
      2015-2011
      Established
      2021

      Our revenue hit a record high of RMB10 billion

      Zhefu Nuclear Power Equipment Co., Ltd. was established

      2020

      The company completed restructuring of assets worth RMB14.5 billion and official expanded its business into pollution-free disposal of hazardous waste and recycling of secondary metals

      Sichuan Huadu Nuclear Equipment Manufacturing Co., Ltd. was listed in the second batch of small specialized and sophisticated companies that produce new and unique products in China

      2019

      We started acquiring full equities of Shenlian Group and 40% equities of Shenneng Environmental Protection

      In November, the main prototype pump of the world’s largest and China's first 600MW fourth-generation commercial liquid metals cooled fast reactor developed by Zhefu Group successfully went through a trial run. Its performance indicators were better than expected, and the life test was completed. It marks a breakthrough in the development of core components of fourth-generation nuclear power commercial fast reactors in China.

      2013

      We formulated the "energy + strategic investment" strategic plan.

      The design of cylindrical valves for large hydro-generator sets was approved in the national appraisal

      The hydraulic mechanical test bench (hydraulic mechanical laboratory) received final acceptance and became world-leading

       

      2012

      We signed a framework agreement with China National Nuclear Corporation on strengthening cooperation in nuclear power and some other fields

      The Zhefu Physical and Chemical Testing Center was officially established

      Our FCJ hydro generator set was recognized as a famous brand of Zhejiang Province.

       

      2011

      The Insulation Testing Center was the first institution in China’s hydropower equipment industry to receive a certificate from the China National Accreditation Service for Conformity Assessment (CNAS)

      2009

      The company was rated as a provincial R & D center of the high-tech company

      2008

      The company was listed on the Shenzhen Stock Exchange

      The CFD digital simulation laboratory and the CAEC were established

      A provincial postdoctoral center (pilot) was approved to be established.

      The R & D Center for the Fuchunjiang Hydro Generator Set was selected as the Provincial R & D Center of the high-tech Company

      2007

      The Insulation R & D Center was established

      2004

      The Hangzhou R & D Center was established

      Zhejiang Fuchunjiang Hydropower Equipment Co., Ltd. was established

      2021

      Our revenue hit a record high of RMB10 billion

      Zhefu Nuclear Power Equipment Co., Ltd. was established

      2020

      The company completed restructuring of assets worth RMB14.5 billion and official expanded its business into pollution-free disposal of hazardous waste and recycling of secondary metals

      Sichuan Huadu Nuclear Equipment Manufacturing Co., Ltd. was listed in the second batch of small specialized and sophisticated companies that produce new and unique products in China

      2019

      We started acquiring full equities of Shenlian Group and 40% equities of Shenneng Environmental Protection

      In November, the main prototype pump of the world’s largest and China's first 600MW fourth-generation commercial liquid metals cooled fast reactor developed by Zhefu Group successfully went through a trial run. Its performance indicators were better than expected, and the life test was completed. It marks a breakthrough in the development of core components of fourth-generation nuclear power commercial fast reactors in China.

      2013

      We formulated the "energy + strategic investment" strategic plan.

      The design of cylindrical valves for large hydro-generator sets was approved in the national appraisal

      The hydraulic mechanical test bench (hydraulic mechanical laboratory) received final acceptance and became world-leading

       

      2012

      We signed a framework agreement with China National Nuclear Corporation on strengthening cooperation in nuclear power and some other fields

      The Zhefu Physical and Chemical Testing Center was officially established

      Our FCJ hydro generator set was recognized as a famous brand of Zhejiang Province.

       

      2011

      The Insulation Testing Center was the first institution in China’s hydropower equipment industry to receive a certificate from the China National Accreditation Service for Conformity Assessment (CNAS)

      2009

      The company was rated as a provincial R & D center of the high-tech company

      2008

      The company was listed on the Shenzhen Stock Exchange

      The CFD digital simulation laboratory and the CAEC were established

      A provincial postdoctoral center (pilot) was approved to be established.

      The R & D Center for the Fuchunjiang Hydro Generator Set was selected as the Provincial R & D Center of the high-tech Company

      2007

      The Insulation R & D Center was established

      2004

      The Hangzhou R & D Center was established

      Zhejiang Fuchunjiang Hydropower Equipment Co., Ltd. was established

      最好看的最新的中文字幕1

      <u id="zarq5"></u>

      1. <i id="zarq5"><thead id="zarq5"><li id="zarq5"></li></thead></i>
      2. <u id="zarq5"><sub id="zarq5"></sub></u>

        <u id="zarq5"></u>